Best H12-425_V2.0 Exam Dumps for the Preparation of Latest H12-425_V2.0 Exam Questions [Q127-Q147]

Rate this post

Best H12-425_V2.0 Exam Dumps for the Preparation of Latest H12-425_V2.0 Exam Questions

Download Latest & Valid Questions For Huawei H12-425_V2.0 exam

NO.127 PDU8000 precision power distribution cabinet supports the monitoring of main circuit phase current, active power, electric energy and branch circuit switch status.

 
 

NO.128 The user can modify the IP address of the ECC800 from the () menu on the ECC800WEB interface.

 
 
 
 

NO.129 The maximum effective distance of WIFI supported by NETECO’s mobile APP is () meters.

 
 
 
 

NO.130 In video surveillance, if the storage time is short (one week), an SD card can be configured for storage.

 
 

NO.131 The ECC800 is the core component of local management of the micro-module, and the access of its southbound components can be extended through the POE bus.

 
 

NO.132 UPS2000-A-(1-3KVA) close the mains input switch and directly enter the bypass working state.

 
 

NO.133 One NetCol520 chilled water distribution units can maximum support () NETCOL5000-C water-cooled row-level precision air conditioners.

 
 
 
 

NO.134 Which of the following functions or components does the UPS6000-E (50kVA power module) come standard with? (Multiple choice)

 
 
 
 

NO.135 After the start-up and debugging of the air conditioner, the indoor temperature is in a reasonable state, and the suction pressure is not lower than () can be regarded as reasonable.

 
 
 
 

NO.136 If the UPS5000-400K cuts the bypass and closes the maintenance side station, both the main power module and the bypass module stop working.

 
 

NO.137 What is the channel type of a typical configuration of FusionModule800? Is a cold aisle or a hot aisle?

 
 

NO.138 The ECC800 does not support the function of sending alarm information by email.

 
 

NO.139 To modify the plan view of the ECC800 micro-module, you need to log in to the WEB with the authority of the plumber to operate.

 
 

NO.140 The UPS5000-E battery adopts the design of no center line, which is convenient to replace the old battery when the tower machine is replaced.

 
 

NO.141 The damage of NETCOL5000-C thermal insulation cotton may cause:

 
 
 
 

NO.142 The component that can realize RS486/CAN to FE interface conversion is ().

 
 
 
 

NO.143 What are the main reasons for the energy saving effect of closed cold/hot aisle? (Multiple choice)

 
 
 
 

NO.144 When the power density of a single cabinet is greater than 10kl/R, which cooling method is recommended?

 
 
 
 

NO.145 Through the optional battery inspection instrument, the ( ) of the UPS battery cell can be detected. (Multiple choice)

 
 
 
 

NO.146 Which of the characteristics of UPS5000-A regarding intelligence are correct? (Multiple choice)

 
 
 

NO.147 NETECOL can assign operation rights to user groups, or directly assign operation rights to users.

 
 

Exam Materials for You to Prepare & Pass H12-425_V2.0 Exam: https://www.premiumvcedump.com/Huawei/valid-H12-425_V2.0-premium-vce-exam-dumps.html