[Q18-Q33] Latest HQT-4180 Practice Test Questions Verified Answers As Experienced in the Actual Test!

Rate this post

Latest HQT-4180 Practice Test Questions Verified Answers As Experienced in the Actual Test!

Pass Hitachi HQT-4180 Exam in First Attempt Easily

Hitachi HQT-4180 Exam Syllabus Topics:

Section Objectives
Pre-installation & Installation – Pre-installation checks
– Hardware installation procedures
– System configuration and validation
Maintenance & Troubleshooting – Incident resolution procedures
– Performance monitoring and diagnostics
– Hardware replacement and upgrades
System Architecture & Components – Core storage architecture concepts
– VSP Midrange system models and specifications
Configuration & Management – Storage pool and parity group configuration
– Management tools (e.g., SVP, Ops Center)

 

Q18. From which two locations can the Maintenance Utility be invoked on a VSP One B26? (Choose two.)

 
 
 
 

Q19. You need to upgrade the firmware on a VSP G700.
Which file must you select to perform the upgrade using the Maintenance Utility?

 
 
 
 

Q20. A customer wants to change a production RAID Group from RAID 5 (7D+1P) to RAID 6 (6D + 2P) on a VSP G700 during normal operations. They have just unmapped the LUNs from the channel ports.
What needs to be performed next?

 
 
 
 

Q21. You are installing a VSP F370 and you need to connect your laptop to one of the controllers.
What are the two default IP addresses of the maintenance ports of CTL1 and CTL2? (Choose two.)

 
 
 
 

Q22. Which two statements are correct when adding cache to a VSP E590? (Choose two.)

 
 
 
 

Q23. 33. A customer wants to remove a VSP G350 from production and virtualize it behind a VSP
5600 in a separate test environment. You inform the customer that as part of the move, it is faster to perform a new installation procedure of the entire VSP G350 system.
How is this accomplished?

 
 
 
 

Q24. A customer has a VSP E1090 with four attached NVMe drive boxes (DBNs).
How many back-end cables are used?

 
 
 
 

Q25. Which two reconfiguration activities are performed without interrupting host access on a VSP Gx00 system? (Choose two.)

 
 
 
 

Q26. The SVP of a VSP G900 system failed and you have been asked to replace it. Which two items must be available to perform the replacement? (Choose two.)

 
 
 
 

Q27. Your customer wants to connect multiple servers to a new port on a VSP G700. The correct topology has already been set for the port.
What should you do next?

 
 
 
 

Q28. Which three RAID configurations are supported by VSP Midrange systems? (Choose three.)

 
 
 
 
 

Q29. A drive in a 3D + 1P RAID group fails in a VSP G700 and there is no spare drive available.
Which two actions are automatically performed by the system? (Choose two.)

 
 
 
 

Q30. Which tool is used for the remote monitoring of a VSP N800 system?

 
 
 
 

Q31. What are two requirements for SVP connectivity on a VSP midrange system? (Choose two.)

 
 
 
 

Q32. A customer wants to upgrade a VSP G700 to 512 GB RAM capacity.
What is the valid CFM configuration?

 
 
 
 

Q33. A customer wants to upgrade their VSP E790 with a SAS Expansion feature. What are three requirements? (Choose three.)

 
 
 
 
 

We offers you the latest free online HQT-4180 dumps to practice: https://www.premiumvcedump.com/Hitachi/valid-HQT-4180-premium-vce-exam-dumps.html

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt