Updated Oct 01, 2022 Verified DES-1121 dumps Q&As – 100% Pass [Q11-Q32]

4.5/5 - (2 votes)

Updated Oct 01, 2022 Verified DES-1121 dumps Q&As – 100% Pass

New 2022 Latest Questions DES-1121 Dumps – Use Updated EMC Exam

Dell EMC PowerMax and VMAX Family Solutions Specialist Exam Certification Details:

Passing Score 63%
Exam Price $230 (USD)
Schedule Exam Pearson VUE
Duration 90 mins
Sample Questions Dell EMC PowerMax and VMAX Family Solutions Specialist Sample Questions

 

QUESTION 11
How does Unisphere 360 differ from Unisphere for PowerMax?

 
 
 
 

QUESTION 12
What will prevent a LUN from being assigned to a second Storage Group?

 
 
 
 

QUESTION 13
Which SYMCLI command can be used to create a new TDEV and assign it to a Storage Group in one step?

 
 
 
 

QUESTION 14
What is the correct sequence of steps to obtain PowerMax licenses and ensure the PowerMax is configured to allow the licensed features to work properly?

QUESTION 15
Where is the automatic backup feature for the Solutions Enabler Group Name Services database set?

 
 
 
 

QUESTION 16
What is the maximum number of bricks that can be configured on a PowerMac 8000 system bay?

 
 
 
 

QUESTION 17
Which VMAX All Flash software package includes Non-Disruptive Migration?

 
 
 
 

QUESTION 18
Refer to the Exhibit.

Which service levels are available for CKD devices’?

 
 
 
 

QUESTION 19
What is a recommendation when using Open Replicator to migrate data from a supported third-party array to a VMAX3 array?

 
 
 
 

QUESTION 20
Two RDF groups from two PowerMax arrays have been added to a Consistency Group SRDF/A Multi-Session Consistency has been enabled for the Consistency Group. The RDF daemon has been started on a single host that has access to both the PowerMax arrays What will happen if the host becomes unavailable?

 
 
 
 

QUESTION 21
A non-production environment has been created with a VMFS Datastore named TestDS and a virtual machine named TestVM. SRDF/S has been configured between two PowerMax arrays One ESXi server is connected to the R1 device and another is connected to the R2 device. The VMFS Datastore resides on the R1 device. The systems administrator wants to test the environment for disaster recovery readiness To simulate a disaster on the R1 side a graceful failover will be done. What is the correct sequence of steps on the R1 side of the test environment to perform a graceful failover?

QUESTION 22
Which service has to be manually started first when Unisphere services are down?

 
 
 
 

QUESTION 23
When using TimeFinder SnapVX, what is the maximum number of linked targets allowed per source?

 
 
 
 

QUESTION 24
Which Unisphere for PowerMax client connection authentication type is irrevocable once it is selected?

 
 
 
 

QUESTION 25
Where are the Host l/Os directed to when the Storage Group is in a Non-Disruptive Migration CutoverReady state?

 
 
 
 

QUESTION 26
What are the Compliance levels tor Storage Groups in Unisphere for PowerMax?

 
 
 
 

QUESTION 27
What is the largest TDEV PowerMaxOS 5978 can create?

 
 
 
 

QUESTION 28
On a PowerMax or VMAX Family array, what is the default Dynamic I/O distribution mode setting when a Storage Group is associated with Host I/O Limits?

 
 
 
 

QUESTION 29
What does a service level define*?

 
 
 
 

QUESTION 30
An administrator is using Unisphere tor PowerMax Workload Planner to assess the performance and compliance of a PowerMax Storage Group (SG) How does the Planner calculate if the Storage Group workload is stable?

 
 
 
 

QUESTION 31
A systems administrator is performing a configuration change on a PowerMax array. Where does the configuration manager perform the change?

 
 
 
 

QUESTION 32
Exhibit.

Which activity needs to be performed prior to the operations shown in the exhibit?

 
 
 
 

Latest DES-1121 Exam Dumps EMC Exam from Training: https://www.premiumvcedump.com/EMC/valid-DES-1121-premium-vce-exam-dumps.html